Updates on University Safety Situation
Temporary Restriction and Repair of Finster Hall
The Office of the City Building Official (OCBO) representative, Engr. Christian Sedrome, conducted an inspection of the repair works at Finster Hall, particularly on the 2nd and 3rd floors, including the seismic gap adjoining Thibault Hall. Following his assessment, he expressed his appreciation for the quality of the completed works and formally approved the lifting of the Yellow Tag and its subsequent replacement with a Green Tag.
We extend our gratitude to the OCBO, the Physical Plant Office, Engr. Allan Medina Structural Engineering Consultancy Services, and the entire University community for their collective efforts in ensuring that our spaces remain safe and conducive to work and learning.
